Corazon Engineering was assigned the task to procure and dismantling a cooling tower and hack the partition concrete wall for Ryco Hydraulics. The project required the use of specialized equipment and techniques to ensure the safe and efficient dismantling of the cooling tower and hacking of the partition wall.