Corazon Engineering

Replace fire fighting gate valve at Boeing

BOEING COMPOSITES MALAYSIA

Project Description

Corazon Engineering was assigned to replace the fire fighting gate valve at Boeing. The project involved the removal of the existing faulty valve and the installation of a new gate valve to ensure the fire protection system operated efficiently and reliably. The work was carried out by experienced personnel using proper safety procedures and specialized tools, ensuring minimal disruption to operations while maintaining compliance with fire safety standards.

Project Information

image

Client Name

BOEING COMPOSITES MALAYSIA

Category

Metallurgy

Start Time

01 Jan, 2024

End Time

26 Apr, 2024

Budget

$20,00,500

Location

Bukit Kayu Hitam, Kedah, Malaysia

Have a
project in
mind?