Corazon Engineering

Diesel tank cleaning and do to UTTM

HACKS (M) SDN BHD

Project Description

Corazon Engineering was assigned to carry out diesel tank cleaning and perform UTTM inspection for Hacks Malaysia Sdn Bhd. The project involved thorough cleaning of the diesel tank to remove sludge, residue, and contaminants, followed by Ultrasonic Thickness Testing Measurement (UTTM) to assess the condition and thickness of the tank structure. Using specialized equipment and strict safety procedures, Corazon Engineering successfully completed the work, ensuring the tank remained safe, reliable, and compliant for continued operation.

Project Information

image

Client Name

HACKS (M) SDN BHD

Category

Metallurgy

Start Time

01 Jan, 2024

End Time

26 Apr, 2024

Budget

$20,00,500

Location

Simpang Ampat, Penang, Malaysia

Have a
project in
mind?