Corazon Engineering was assigned to reroute new SUS piping and dismantle the heat exchanger for Hacks (M) Sdn Bhd in preparation for their JKKP annual inspection. The project required precision handling and adherence to strict safety and regulatory standards. The team successfully rerouted the new SUS pipeline and safely dismantled the heat exchanger, ensuring the system was ready for inspection.